Scheduler

The scheduler is used to plan when and how often the Cube will be refreshed/reloaded:

  • Load All will remove the data and re-load everything into the cube.
  • Refresh does add only new records based on the Tracking defined at the Data Source level.
  1. In the Cubes List, select a Cube.
  2. In the Navigation Bar, click on the Navigation drop-down list and select Scheduler.
Description:
A description.
Action:
Load All or Refresh.
Type:
Frequency of Job.
Last Start Run Date:
Last time the Job ran.
Last End Run Date:
Last time the Job finished.
Next Run Date:
Next time the job will run.
Status:
Last execution result status.