Scheduler
The scheduler is used to plan when and how often the Cube will be refreshed/reloaded:
- Load All will remove the data and re-load everything into the cube.
- Refresh does add only new records based on the Tracking defined at the Data Source level.
- In the Cubes List, select a Cube.
- In the Navigation Bar, click on the Navigation drop-down list and select Scheduler.
- Description:
- A description.
- Action:
- Load All or Refresh.
- Type:
- Frequency of Job.
- Last Start Run Date:
- Last time the Job ran.
- Last End Run Date:
- Last time the Job finished.
- Next Run Date:
- Next time the job will run.
- Status:
- Last execution result status.