Add a Schedule
Job Details
- Description
- Enter a name for your schedule.
- Extraction
- Select on which extraction(s) you want to perform an action.
- Action
- Select which action you want to perform. You will have to choose between Incremental Load which will only apply the changes from the last time that the extraction was run (based on the Triggers logic or the Date), Load (for a Migration extraction type only) which will load all the data from the source, Truncate and Load which will delete the destination table if there are data, and then load all from source and Process Delete Record which will perform deletion in the destination if there was deletion in the source when synchronizing data.
- Active
- Tick this checkbox if you want to keep this schedule running.
- Max number of logs to keep
- Set the desired value.
General
- Periodicity
- Set which frequency the action should be performed according to your needs.
- Advanced
- Set the timezone.
- Click on Save.